Rain or wind need not halt your job. A scaffold wrapped in shrink wrap gives a dry, sheltered working space. Here is how it works.
A dry working space around the scaffold
We fully wrap the scaffold in sturdy shrink wrap. That keeps the work dry and sheltered, even in rain, wind or cold.
Working on saves time
No delays from bad weather means your project stays on schedule. For painting, pointing and façade work that is often the difference of weeks.
Neatly wrapped and removed again
We fit the wrap tightly and remove it neatly after the work, together with the scaffold. Everything is taken away.
Scaffold with shrink wrap across Kennemerland
GSD Steigerbouw provides scaffolds with shrink wrap so you can keep working dry. From Haarlem across the Kennemerland region. Request a quote without obligation.